Search the Community
Showing results for tags 'board'.
-
Ok team, just finished getting my scuttle to fit onto the chassis as its currently got the rear-panel, and side panels fitted to locate the rather complicated cut-out for the fly-by-wire throttle. Have my dash fitted out with some of the switches etc, following AdgeC lay-out, without the AIM dash in it yet,and have just offered up the dash panel to roughly line up the edges. I also used a straight line to bend the 2 welded on brackets, to help support the dash, is that correct? I have worked out that the crash pad which goes around the outside must then cover the bolt's holding the dash to the scuttle, and following other builds am going to order the M4 clips https://www.amazon.co.uk/Speed-Fastener-Chimney-Tapping-Metric/dp/B01MCYOL7I/ref=sr_1_4?s=automotive&ie=UTF8&qid=1521243951&sr=1-4&keywords=Metric+Screw+Lug+Spire+Clips Have not seen anybody really detail how many screws are generally used to bolt the two together, so looking for advise on how many to use? I'm then assuming that the crash pad is fixed using hook & loop tape to hold this in place? I like the idea of being able to drop out the dash if needed by just un-screwing after removing the crash pad. Have a bag odd button head M5 screws/washers/nyloc's x10 sets from WF, but that seems like a hell of a lot of LARGE fixings so am planing to switch to M4, and that I think nuts would be a b***h to un-do if I ever needed to remove