BenD Posted September 8, 2018 Share Posted September 8, 2018 I have 4 complete rolls 7.6meters long £65 a roll including the post. Can sell it by the meter if you don't want the roll £10 a meter postage included Link to comment Share on other sites More sharing options...
B.RAD Posted September 9, 2018 Share Posted September 9, 2018 PM sent Link to comment Share on other sites More sharing options...
Kingster Posted September 9, 2018 Share Posted September 9, 2018 @Ben (bunje) can you save me 2m and bring it to Cadwel next month? Still have a few bits of non-barricade fuel line to replace over winter. Link to comment Share on other sites More sharing options...
BenD Posted September 9, 2018 Author Share Posted September 9, 2018 12 minutes ago, Chris King - Webmaster and Joint North East AO said: @Ben (bunje) can you save me 2m and bring it to Cadwel next month? Still have a few bits of non-barricade fuel line to replace over winter. Yes mate no problem Link to comment Share on other sites More sharing options...
BenD Posted September 9, 2018 Author Share Posted September 9, 2018 17 minutes ago, BCF said: PM sent Received Link to comment Share on other sites More sharing options...
Tim Reid Posted September 9, 2018 Share Posted September 9, 2018 Silly question but what fittings can be used to connect this hose to a -6 fitting? Link to comment Share on other sites More sharing options...
BenD Posted September 9, 2018 Author Share Posted September 9, 2018 1 hour ago, Tim (TimDave25) - Joint Thames Valley AO said: Silly question but what fittings can be used to connect this hose to a -6 fitting? I've just swapped a few of my jic6 fittings for barbed and used these https://rover.ebay.com/rover/0/0/0?mpre=https%3A%2F%2Fwww.ebay.co.uk%2Fulk%2Fitm%2F360923604944 Link to comment Share on other sites More sharing options...
corsechris Posted September 9, 2018 Share Posted September 9, 2018 Hi Ben, I'll take a roll please. I'll PM to confirm as well. Ta. Link to comment Share on other sites More sharing options...
Steve (sdh2903) Posted September 9, 2018 Share Posted September 9, 2018 12 hours ago, Chris King - Webmaster and Joint North East AO said: @Ben (bunje) can you save me 2m and bring it to Cadwel next month? Still have a few bits of non-barricade fuel line to replace over winter. If you still have enough left @Ben (bunje) I would take the remainder of this roll. Link to comment Share on other sites More sharing options...
BenD Posted September 10, 2018 Author Share Posted September 10, 2018 12 hours ago, Steve (sdh2903) said: If you still have enough left @Ben (bunje) I would take the remainder of this roll. ok steve im not entirley sure how much i have left at present its all happend a bit fast lol let me check when i get home and ill get back to you tonight Link to comment Share on other sites More sharing options...
Steve (sdh2903) Posted September 10, 2018 Share Posted September 10, 2018 No probs Link to comment Share on other sites More sharing options...
BenD Posted September 10, 2018 Author Share Posted September 10, 2018 1 full roll left Link to comment Share on other sites More sharing options...
BenD Posted September 14, 2018 Author Share Posted September 14, 2018 Last roll left if anyone needs it Link to comment Share on other sites More sharing options...
BenD Posted September 28, 2018 Author Share Posted September 28, 2018 Btt Link to comment Share on other sites More sharing options...
BenD Posted October 18, 2018 Author Share Posted October 18, 2018 Still one roll left Link to comment Share on other sites More sharing options...
Recommended Posts