combatsapph Posted August 24, 2006 Share Posted August 24, 2006 Hi all, I'm running a pair of fuel lines down the transmission tunnel - does anybody know how often you have to p-clip them? I have a gap between p-clips of 300mm at one point - just wondering if I need to make up a bridging bracket for this gap. Cheers. Rob. Quote Link to comment Share on other sites More sharing options...
scruffythefirst Posted August 24, 2006 Share Posted August 24, 2006 300mm is the max for sva. Closer is better though. Quote Link to comment Share on other sites More sharing options...
combatsapph Posted August 24, 2006 Author Share Posted August 24, 2006 Thanks for the reply. i should be able to "double up" on the gap then, reducing the gap to about 275mm. this large gap is only in one place and it's 8mm rigid pipe, so I would be happy with that interval. Thanks again. Quote Link to comment Share on other sites More sharing options...
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.