After a week of Jacob fitting the door lock (too near the edge and upside down but who cares, we can use the door) and me having 7 trips to the tip with the Fiat estate packed to the roof (three car loads of concrete blocks!) the bottom three pictures on this page show the results. It looked like a war zone before.

 

CLICKY HERE

  • Like 1
Link to comment
Share on other sites

See what you mean about those windows, not small are they!

 

Steady progress at least...  :d 

Link to comment
Share on other sites

He's got the barge boards, the inside boards of the angles, lime render on the concrete blockwork and the floor tiles to lay. I reckon that's 2 days work for a builder and a labourer. I'm guessing it'll take 10 days.

 

In October.

 

Ed to add the retaining battens for the large windows.

 

I'm contemplating if I should try and clean the insides of them. I'm going to drill holes along the tops and bottoms. But the insides are "streaky" so I may make a long rod from welding rods and glue a piece of cloth to one end so I can push it through the holes and clean the insides of the glass. Worth a try.

Link to comment
Share on other sites

If you are going to change in there, I hope you will fit good curtains or you'll scare the wildlife - not to mention guests !! :d 

 

 

OK - your high pressure sales technique has worked - we want to stay at your gite !  :d  :d

Link to comment
Share on other sites

I've been changing from good to working clothes in there all week. Our guests didn't seem to mind as they didn't see me.

 

I bought a shoe rack/table from Ikea yesterday and my footwear is slowly coming down. I've already got the coat hooks on the walls and the coats will be next. Think of it as a fancy boot room.

Link to comment
Share on other sites

See what you mean about those windows, not small are they!

They're only 8' x 4' sheesh, wassup wiv you guy's, aint ya bin on a BIG job? :p

Link to comment
Share on other sites

I couldn't possibly say, Paul.

 

But for a small porch they are BIG windows. It's not M&S is it.

Link to comment
Share on other sites

Nope, biggest were on a five storey bank headquarters I worked on near Wiesbaden years ago.

Link to comment
Share on other sites

It will when it's finished - in October!

 

Jacob's made a good job of it, but it'll be a year before it's finished as we started in the first week in October.

 

I'm going to get some cement next week and mix and lay a concrete bed with terra-cotta tiles on top. I'll start outside the front door and work my way round. I'm planning on doing the whole area.

Link to comment
Share on other sites

just seen pic's ....

i thought you had bought a porche !!!

sorry norm must read post properly........

Link to comment
Share on other sites

No, I call it our Ferrari.

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...

Important Information

Please review our Terms of Use, Guidelines and Privacy Policy. We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.